Başakşehir – Kayaşehir Metro Project

Main Contractor : ŞENBAY – ÖZGÜN – SÖĞÜT Joint Venture
Scope of Özsöz : TBM operation between Kayaşehir- Başakşehir
Line Length : 3.298 m (Double Line total)
Number of TBM : 2
Excavation Diameter : 6570 mm
Segment Length :
1,50 m
Segment Outer Diameter :
6300 mm
Segment Inner Diameter :
5700 mm
Contract Date :
02.06.2020
Start Date :
25.08.2020
Completion Date :
March/2021
Scope of Özsöz :
Excavation with the TBM Provided by the Employer, Assembly of the Produced Segments and Completion of the Injection Works.