COMPLETED PROJECTS

Mersin Pamukluk Dam Irrigation Transmission Tunnel

By |2023-07-25T10:51:49+00:00July 13th, 2023|COMPLETED PROJECTS|

Mersin Pamukluk Dam Irrigation Transmission Tunnel Main Contractor : İNELSAN İnş. Elekt . San. ve Tic. A. Ş.Scope of E-BERK : IRRIGATION TRANSMISSION TUNNELLine Length : 4618 mNumber of TBM : 1Excavation Diameter : 4980 mmSegment Length : 1500 mmSegment Outer Diameter : 4800 mmSegment Inner Diameter : 4200 mmContract Date : 25.01.2016Start Date :

Güzelyurt and Meserya Cyprus Plain Irrigation Transmission Tunnel

By |2023-07-25T10:57:03+00:00July 13th, 2023|COMPLETED PROJECTS|

Güzelyurt and Meserya Cyprus Plain Irrigation Transmission Tunnel Main Contractor : Makyol İnşaat Sanayi Turizm ve Ticaret Aş.Scope of ÖZSÖZ : Irrigation Transmission TunnelLine Length : 5700 mNumber of TBM : 1Excavation Diameter : 4800 mmSegment Length : 1500 mmSegment Outer Diameter : 4600 mmSegment Inner Diameter : 400 mmContract Date : 15.01.2018Starting Date

Ergene Deep Discharge Waste Water Transmission Tunnel Project

By |2023-07-25T10:44:10+00:00July 13th, 2023|COMPLETED PROJECTS|

Ergene Deep Discharge Waste Water Transmission Tunnel Project Main Contractor : ÖZGÜN Yapı ve Sanayi Ticaret a.ş. Scope of E-BERK : Waste Water Transmission Tunnel Project. E-Berk’s manufactured "Anadolu“ and “Lale” TBMs, were used at Ergene Deep Discharge Waste Water Tunnel Constuction Project for Tunnel A Line and Tunnel B Line. Tunnel A

Tunisia Rades Combined Cycle Power Plant Project Cooling Tunnel

By |2023-07-25T11:27:26+00:00July 13th, 2023|COMPLETED PROJECTS|

Tunisia Rades Combined Cycle Power Plant Project Cooling Tunnel  Main Contractor : Gama HoldingScope of E-BERK : Combined Cycle Power Plant Project Cooling Tunnel Line Length : 231 mNumber of TBM : 1 MTBMExcavation Diameter : 2435 mmSegment Length : 3000 mmSegment Outer Diameter :2400 mmSegment Inner Diameter : 2000 mmContract Date : 22.06.2018Start

Halkalı – Istanbul Airport Metro Project

By |2023-07-25T11:37:26+00:00July 13th, 2023|COMPLETED PROJECTS|

Halkalı – Istanbul Airport Metro Project Main Contractor : Yedigöze İnş.Dan.Otom. İç.ve Dış Tic. Ltd.Şti.Scope of Özsöz : TBM operation between Olimpiyatköy - FenertepeLine Length : 15.176 m. (Double Line total)Number of TBM : 2Excavation Diameter : 6570 mmSegment Length : 1,50 mSegment Outer Diameter : 6300 mmSegment Inner Diameter : 5700 mmContract Date :

Başakşehir – Kayaşehir Metro Project

By |2023-07-25T12:03:25+00:00July 13th, 2023|COMPLETED PROJECTS|

Başakşehir - Kayaşehir Metro Project Main Contractor : ŞENBAY - ÖZGÜN - SÖĞÜT Joint VentureScope of Özsöz : TBM operation between Kayaşehir- BaşakşehirLine Length : 3.298 m (Double Line total)Number of TBM : 2Excavation Diameter : 6570 mmSegment Length : 1,50 mSegment Outer Diameter : 6300 mmSegment Inner Diameter : 5700 mmContract Date : 02.06.2020Start

Bakırköy-Kirazlı Metro Project

By |2023-07-25T10:31:06+00:00July 13th, 2023|COMPLETED PROJECTS|

Bakırköy-Kirazlı Metro Project Main Contractor : AGA Enerji Nak. Mad. İnş. San. Ve Tic.A.Ş.Scope of Özsöz : TBM operation between İncirli-KirazlıLine Length : 6.975 ( Double Line total )Number of TBM : 2Excavation Diameter : 6570 mmSegment Length : 1,50 m.Segment Outer Diameter : 6300 m.Segment Inner Diameter : 5700 m.Contract Date : 16.10.2020Start Date

Go to Top